ramps list of a storey (BmRamp).
Import
Example
tests/fixtures/basement-ramp.project.json in the Floorkit repository: the ramp climbs 3.2 m from a basement at -3.2 m to the ground at 0 m. Its 1:12 maxSlope is a value chosen for that fixture, not a code limit.
Fields
pathis the plan centreline, a list of[x, z]points. The ramp starts at the first point.widthis the width across the path.thicknessis the depth of the plate under the walking surface.fromElevationandtoElevationare the heights of the walking surface at the first and the last point, in metres above the storey’selevation. A ramp can go down:toElevationcan be belowfromElevation.landingsare flat stretches.atis the distance in metres along the path from its first point;lengthis the length of the landing. Landings come in order and end on the path.- The rest of the path takes one even slope: the rise divided by the path length that is not a landing.
- A point of
pathwhere the direction changes must lie inside a landing that reaches far enough past it to hold the corner, or the ramp is refused withramp-turn-needs-landing. The landing builds as one flat corner piece. - A ramp needs some length that is not a landing, or it is refused with
no-slope-run. maxSlopeis the steepest rise over run you allow. A ramp that is steeper is refused withramp-too-steep. Floorkit has no default limit: choose the value from the code that applies to your project.
Drawing
- A plan draws one outline of the whole ramp, a line across each end of a landing, the walkline, an arrowhead at the higher end and the slope as
1:n. A ramp above the cut draws dashed, and not at all in a plan withhideStairAboveCut. - Sections cut the ramp. Its cut regions carry
ogType: 'RAMP'. Elevations and the 3D view show it.
Notes
- All dimensions are in metres.
- Validation codes:
bad-path,zero-length-segment,bad-width,bad-thickness,bad-elevation,bad-landing,bad-maxSlope,ramp-turn-needs-landing,no-slope-runandramp-too-steep. - IFC export of a ramp as
IfcRampis not part of this release.