A soil stack is a vertical soil and vent pipe beside the outer face of a wall. It stands in a storey, from the site ground or a set height up to its top, and can end in a vent terminal. Plans draw it as a circle, elevations and sections see it, and IFC exports it as a pipe segment.

Before you start

You have the house of Add a roof: a room of walls from x 0 to 6 and z 0 to 4, whose outer faces are 0.1 metres outside the wall path, and a gable roof with its eaves 2.83 metres above the storey.

Write the stack

This stack stands against the east wall, whose outer face is at x 6.1. The pipe is 0.11 metres across, so its centre is a radius plus a 0.04 metre bracket gap off the face, at x 6.195. It rises from the site ground to 2.7 metres above the storey, under the eave, and ends in a wire balloon.

Add it to the storey

A soil stack is an entry in the soilStacks list of its storey.
replace-element changes it and remove-element takes it away. This one starts 0.15 metres above the storey and ends in a capped vent.

Rules

  • at is the plan centre of the pipe in world x and z (bad-point). diameter is the outside diameter in metres above zero (bad-diameter); the default is 0.11.
  • top is the metres from the storey elevation to the top of the pipe, the terminal not included (bad-top). baseOffset is the metres from the storey elevation to the foot (bad-base-offset), below top (stack-top-below-base). With no baseOffset the foot is on the site ground under at: on the ground surface of the site where it has groundPoints, else at the site elevation.
  • A foot that the ground puts at or above top builds no pipe and warns stack-under-ground.
  • terminal.kind is open, cage or cowl (bad-terminal); terminal.height is metres above zero (bad-terminal), default 0.15. open and no terminal leave the pipe end open. cage is a wire balloon 1.4 times the pipe across. cowl is a vent the size of the pipe under a cap 1.8 times the pipe across, the cap a quarter of the height.
  • A soil stack cuts no roof and no slab. Where it passes a roof, the roof plan draws the roof over it.
  • A plan draws one circle of the pipe on the plan of its storey and on the plan of each storey above whose cut plane the pipe passes.
  • Elevations see the pipe and its terminal, and sections cut them. The drawings take the stack’s own phase; set-phase marks it, and a copied storey copies it with a new id.
  • IFC exports a soil stack as one IfcPipeSegment of predefined type RIGIDSEGMENT; its terminal is part of the same element.

Next