Before you start
You have the house of Add a roof: a room of walls from x 0 to 6 and z 0 to 4, whose outer faces are 0.1 metres outside the wall path, and a gable roof with its eaves 2.83 metres above the storey.Write the stack
This stack stands against the east wall, whose outer face is at x 6.1. The pipe is 0.11 metres across, so its centre is a radius plus a 0.04 metre bracket gap off the face, at x 6.195. It rises from the site ground to 2.7 metres above the storey, under the eave, and ends in a wire balloon.Add it to the storey
A soil stack is an entry in thesoilStacks list of its storey.
replace-element changes it and remove-element takes it away. This one starts 0.15 metres above the storey and ends in a capped vent.
Rules
atis the plan centre of the pipe in world x and z (bad-point).diameteris the outside diameter in metres above zero (bad-diameter); the default is 0.11.topis the metres from the storey elevation to the top of the pipe, the terminal not included (bad-top).baseOffsetis the metres from the storey elevation to the foot (bad-base-offset), belowtop(stack-top-below-base). With nobaseOffsetthe foot is on the site ground underat: on the ground surface of the site where it hasgroundPoints, else at the site elevation.- A foot that the ground puts at or above
topbuilds no pipe and warnsstack-under-ground. terminal.kindisopen,cageorcowl(bad-terminal);terminal.heightis metres above zero (bad-terminal), default 0.15.openand no terminal leave the pipe end open.cageis a wire balloon 1.4 times the pipe across.cowlis a vent the size of the pipe under a cap 1.8 times the pipe across, the cap a quarter of the height.- A soil stack cuts no roof and no slab. Where it passes a roof, the roof plan draws the roof over it.
- A plan draws one circle of the pipe on the plan of its storey and on the plan of each storey above whose cut plane the pipe passes.
- Elevations see the pipe and its terminal, and sections cut them. The drawings take the stack’s own
phase;set-phasemarks it, and a copied storey copies it with a new id. - IFC exports a soil stack as one
IfcPipeSegmentof predefined typeRIGIDSEGMENT; its terminal is part of the same element.
Next
Add a roof
Gutters and downpipes on the roof edges.
Draw the existing and the proposed state
Mark a stack to be removed.